Architectural projects succeed when every discipline works together — and yet HVAC is often left out of early-stage design conversations.
At Oxford Air Conditioning, we’ve seen time and again how engaging HVAC engineers at RIBA Stage 2 can make the difference between a smooth, efficient project and one that’s forced into costly compromises later.
1. The Cost of Late Involvement
Leaving mechanical services until later stages often means:
- Revisions to layouts when plant space or duct routes clash with design intent
- Higher project costs due to rework and inefficiency
- Compromises on comfort (temperature, acoustics, airflow) that frustrate end-users
2. How HVAC Input at Stage 2 Adds Value
At RIBA Stage 2 (Concept Design), architectural intent is being set. Bringing HVAC into the room means we can:
- Ensure plant space and service zones are correctly sized and located
- Advise on sustainable design choices that meet Part L and energy standards
- Plan for integration with lighting, AV, and structural systems
- Protect the aesthetic vision of the architect by avoiding later compromises
3. Complex Projects Demand Early Collaboration
In heritage refurbishments, tight urban sites, or high-spec fit-outs, space is at a premium. Early HVAC engagement gives the project team the best chance to make smart decisions, avoid redesigns, and build in flexibility for future needs.
4. A Partnership Approach
We don’t just “fit in” systems — we partner with architects, surveyors, and consultants to deliver designs that work technically and respect design integrity.