Oxford AC’s Pre-Design HVAC Checklist: Setting Your Project Up for Success

Intro:
Successful building design depends on collaboration. While HVAC systems may be hidden behind walls and ceilings, their impact on comfort, compliance, and long-term building performance is huge.

Yet, too often, HVAC is brought in after key design decisions have been made. The result? Costly redesigns, compromised aesthetics, and systems that don’t perform as intended.

That’s why Oxford Air Conditioning has developed a Pre-Design HVAC Checklist — a practical tool for architects, property consultants, and building surveyors to use during early design stages (particularly at RIBA Stage 2).

By considering these points early, you’ll protect your design intent, avoid common risks, and set your project up for long-term efficiency and comfort.


✅ 1. Space Planning: Plant, Risers & Service Routes

One of the most common pitfalls in HVAC design is insufficient space allocation.

  • Plant rooms must be sized to accommodate not just today’s requirements, but potential future upgrades.
  • Riser locations should be planned to serve all floors efficiently.
  • Service routes (ducts, pipes, cables) need clear pathways to avoid clashes with structure or other services.

Early coordination here avoids late-stage compromises that can disrupt design flow and increase costs.


✅ 2. Acoustic & Thermal Comfort Considerations

HVAC systems do more than heat and cool — they directly affect how people experience a space.

  • Noise control: Plant and ductwork must be positioned and specified to meet acoustic targets.
  • Air distribution: Diffuser layouts and duct sizing affect comfort and usability.
  • Zoning: Thoughtful zoning helps tailor conditions for different spaces, improving wellbeing and productivity.

Factoring in comfort at concept stage ensures the building works for its occupants.


✅ 3. Energy Efficiency & Compliance Checkpoints

Sustainability and compliance can’t be retrofitted.

  • Ensure designs align with Part L requirements and other building regulations from the outset.
  • Explore low-carbon technologies such as heat pumps or VRF systems.
  • Consider smart controls and monitoring for long-term performance optimisation.

Early engagement allows HVAC engineers to propose energy-efficient solutions that reduce operational costs and support ESG goals.


✅ 4. Integration with Other Building Services

HVAC rarely operates in isolation.

  • Lighting, AV, and fire systems all share space and must be coordinated.
  • Architectural intent — from ceiling heights to façade treatments — needs to work in harmony with service requirements.
  • Digital tools (BIM, Revit models) enable clash detection and smoother integration when used early.

By thinking holistically, you avoid conflicts and reduce rework later in the project.


✅ 5. Maintenance & Access Requirements

A design that looks great on paper may fail in practice if maintenance isn’t considered.

  • Provide adequate access for servicing of plant and equipment.
  • Ensure safe working clearances around equipment in line with regulations.
  • Think about lifespan and replacement strategies for major components.

Early planning means fewer operational headaches for building managers — and happier end-users.


🏗️ The Value of Early Engagement

By applying this checklist at concept stage, you reduce project risk, protect design quality, and deliver a building that performs as intended for decades.

At Oxford Air Conditioning, we specialise in bespoke, complex projects where early engagement makes all the difference. From heritage refurbishments to high-spec commercial fit-outs, our team brings technical expertise and design sensitivity to every project.